Top Left:                The climber secures choker to top of                                   log in preparation to lift first log                                          section.

 

Top Right:              The climber cuts through log while the                                   crane operator applies a slight lift.

 

Centre Left:            Log sections are placed in a safe area in                                   preparation for the logging truck.

 

Bottom Left:          The self-loader logging truck loads logs                                   into bunks.

 

Bottom Right:        Approximately 10 cubic meters of Red                                   Cedar heads off to the sawmill.