|
Top Left: The climber secures choker to top of log in preparation to lift first log section.
Top Right: The climber cuts through log while the crane operator applies a slight lift.
Centre Left: Log sections are placed in a safe area in preparation for the logging truck.
Bottom Left: The self-loader logging truck loads logs into bunks.
Bottom Right: Approximately 10 cubic meters of Red Cedar heads off to the sawmill. |



